Designed and built in-house, with design led by our Executive Director, Chong Hai Beng. Guestrooms and lift lobbies on Levels 9 to 18 in two phases, then the welcome lobby, the Level 7 common areas and the grand ballroom. The hotel opened in January 2025.
Levels 9 to 18 Guestrooms and lift lobbies
2024 Opened January 2025
Design and build Lobby, Level 7, ballroom
In-house Design led by Chong Hai Beng




Hotel interiors, delivered to programme and brand standard.
Start a project →